Roles & permissions
Manufacturing Admin
- Creates: product manufacturing setup rules, BoM, routings, work centers, and configuration standards.
- Updates: approved master data when controlled changes are required.
- Approves: BoM revisions, routing sequence changes, and critical consumption policy changes.
- Should not change freely: released production quantities or execution logs without process review.
Planner
- Creates: manufacturing orders, planned dates, and release priorities.
- Updates: schedule, owner assignment, and order readiness status.
- Approves: release-to-execution when readiness checks pass.
- Should not change freely: BoM and routing master definitions.
Production Supervisor
- Creates: work-order assignment plan by work center.
- Updates: execution progress, pause/continue actions, and blocker notes.
- Approves: completion readiness before order closure.
- Should not change freely: cost assumptions and warehouse policy setup.
Work Center Operator
- Creates: operation execution logs and practical status updates.
- Updates: start/pause/continue/done progression and time tracking entries.
- Approves: operation completion at assigned step level.
- Should not change freely: master BoM, routing order, or cross-center policy.
Inventory / Warehouse Coordinator
- Creates: component issue and finished-goods receipt handoff records.
- Updates: movement references tied to production orders.
- Approves: warehouse-side handoff completion based on policy.
- Should not change freely: manufacturing order planning parameters.
Quality / Reviewer (where used)
- Creates: review notes and exception records.
- Updates: verification status tied to completed output.
- Approves: pass/fail or acceptance checkpoints based on local process.
- Should not change freely: released quantity or consumption logs without governance.
Ownership rule:
- BoM and routing changes should be owned by Manufacturing Admin (or designated engineering owner).
- Production execution should be owned by Planner/Supervisor/Operators.
- Warehouse issue/receipt ownership should stay with Inventory/Warehouse coordinators.
Setup checklist
- Products and variants
- Confirm manufactured products and product variants are complete.
- Validate product type/category and sales/purchase/manufacturing flags.
- Confirm SKU/barcode conventions and readiness for production use.
- Units of measure
- Define unit categories and reference units.
- Set conversion ratios and precision standards.
- Validate quantity consistency for BoM and order execution.
- BoM setup
- Create bills of materials for each manufactured product.
- Add components, quantities, and unit-of-measure mapping.
- Define variant applicability where needed.
- Establish review and approval control for BoM updates.
- Routing setup
- Build routings with ordered operations.
- Define default durations and start-next-operation behavior.
- Add notes and Work instruction where needed.
- Validate against real production flow.
- Work centers
- Create work center name/code standards.
- Set working hours, capacity, and time efficiency assumptions.
- Define cost/hour references for review reporting.
- Warehouse handoff design
- Confirm Components warehouse for issue.
- Confirm Finished Products warehouse for receipt.
- Validate issue and receipt handoff sequence for production closure.
- Readiness and consumption rules
- Define Manufacturing Readiness policy (all components vs first operation availability).
- Define consumption behavior (strict vs flexible).
- Confirm fields for qty to consume, reserved, and consumed.
- Shortage and purchase-request policy
- Define when to create purchase request from manufacturing shortages.
- Define owner for shortage escalation and follow-up.
- Set review routine for recurring shortage items.
- Costing expectations
- Confirm cost/hour assumptions by work center.
- Align expectations for Total Material Cost and Total Labour Cost review.
- Define variance thresholds for management escalation.
- Go-live test scenarios
- Test one full cycle: BoM + routing + manufacturing order + execution + consumption + finished-goods posting.
- Test shortage flow with create purchase request.
- Test status transitions: draft / planned / confirmed / in progress / done / canceled.
- Test planned vs actual quantity, time tracking, and variance review.
Key workflows
1) Create a BoM for a manufactured product
- Select or create the manufactured product.
- Create the BoM and add components.
- Enter quantities and assign units of measure.
- Review completeness and production readiness.
- Approve/standardize the BoM for release.
2) Create routing and work centers
- Define required work centers.
- Create routing for the target product.
- Add operations in execution order.
- Assign duration assumptions and Work instruction notes.
- Validate routing against real shop-floor sequence.
3) Create and release a manufacturing order
- Select product and quantity to produce.
- Link BoM and routing.
- Set planned start/planned finished dates and owner.
- Check material readiness and shortages.
- Confirm and release the order.
4) Execute work order
- Start work order at assigned work center.
- Progress through operations in sequence.
- Update status (pause/continue) and track production time.
- Record blockers and waiting states.
- Mark operation complete when finished.
5) Consume materials and receive finished goods
- Issue components from Components warehouse.
- Record actual consumption against planned requirement.
- Confirm quantity produced.
- Receive output in Finished Products warehouse.
- Close work order and manufacturing order with handoff verification.
6) Handle shortages with purchase requests
- Identify missing component quantities during readiness checks.
- Create purchase request from manufacturing.
- Track shortage impact on release and schedule.
- Resume execution when components are available.
- Log recurring shortage causes for planning improvement.
7) Monthly production review
- Review work order status summary and throughput by period.
- Compare planned vs actual output.
- Review material usage variance and recurring exceptions.
- Review work-center cost/time performance.
- Review BoM changes logs and identify control gaps.
- Assign corrective actions for next cycle.
Reports
Work order summary
- Contains: work orders by status, owner, and work center.
- Used by: Production Supervisor, Planner.
- Decision supported: daily release priority and bottleneck escalation.
Throughput by period
- Contains: quantity produced by day/week/month and trend context.
- Used by: Operations management, Planner.
- Decision supported: capacity and output reliability planning.
Planned vs actual output
- Contains: quantity to produce vs quantity produced by order/product.
- Used by: Production Supervisor, Operations manager.
- Decision supported: schedule correction and execution discipline review.
Material usage and variance
- Contains: planned component usage vs consumed quantities and key deviations.
- Used by: Manufacturing Admin, Inventory/Warehouse Coordinator.
- Decision supported: BoM accuracy updates and consumption control actions.
Cost and variance review
- Contains: Cost/Hour context, Total Material Cost, Total Labour Cost, and duration deviation indicators.
- Used by: Operations management, finance reviewers.
- Decision supported: corrective action on cost drift and productivity issues.
BoM changes logs
- Contains: change type, quantity change, date/time, and user history.
- Used by: Manufacturing Admin, reviewers/auditors.
- Decision supported: master-data governance and change-accountability control.
Troubleshooting / FAQ
Components are missing at release time
- Check availability in the Components warehouse.
- Confirm reserved quantities are not locked by another order.
- Create purchase request if shortage blocks planned release.
Routing does not match real production flow
- Review operation sequence with supervisor and work center lead.
- Update routing order and durations under controlled approval.
- Revalidate with one pilot order before broad release.
Work order cannot start
- Verify manufacturing order status is confirmed/in progress per policy.
- Check material readiness rule for required components.
- Confirm work center assignment and owner permissions.
Consumption looks wrong
- Compare qty to consume vs consumed quantities by operation.
- Review unit-of-measure conversions and precision settings.
- Investigate manual overrides and enforce strict behavior where needed.
Finished goods were not posted correctly
- Verify quantity produced entry before closure.
- Confirm target Finished Products warehouse selection.
- Recheck issue/receipt handoff logs before re-posting adjustments.
Shortage-driven purchase request is missing
- Confirm shortage threshold and trigger policy configuration.
- Validate user role can create purchase request from manufacturing.
- Check request linkage in order references.
BoM changed without control
- Review BoM changes logs and identify who changed what.
- Restrict edit rights to Manufacturing Admin/designated owner.
- Enforce approval flow before applying master-data updates.
Teams confuse Manufacturing with Inventory ownership
- Clarify ownership matrix in onboarding:
- Manufacturing owns how products are built and executed.
- Inventory owns stock balances and warehouse movement control.
- Procurement owns supplier buying and purchase cycles.
Need help with this section? Contact our team for guided setup support.