Roles & permissions
Recommended roles:
- Manufacturing Admin
- Manages master data (BOMs, routings, work centers) and configuration.
- Planner
- Creates work orders, schedules work, and manages priorities.
- Production Supervisor
- Assigns work, reviews progress, resolves blockers.
- Work Center Operator
- Executes steps and updates statuses (where applicable).
- Inventory/Warehouse
- Issues materials and receives finished goods when integrated.
- Quality / Reviewer
- Performs checks and records outcomes (if enabled in your flow).
Best practice:
- Separate “master data owners” from “execution users” to keep BOMs/routings clean.
Setup checklist
### 1) Confirm Inventory foundations
Manufacturing works best with Inventory enabled:
- Item master data (components and finished goods)
- Warehouses/locations
- Stock movement governance
### 2) Define work centers
Create work centers that reflect production stations:
- Name (e.g., Cutting, Assembly, Packaging)
- Capacity assumptions (if used)
- Ownership (who manages the station)
### 3) Define routings
Routings describe the execution path:
- Sequence of operations/steps
- Work center per step
- Estimated time per step
- Ownership per step
### 4) Build Bills of Materials (BOM)
For each manufactured product:
- Define component list and quantities
- Define allowed substitutes (if used)
- Validate BOM against real production usage
### 5) Define production policies
Decide:
- How materials are issued (pre-issue, issue-by-step, issue-at-start)
- How finished goods are received (upon completion, batch receive)
- Who can adjust quantities and why
- How you handle rework/scrap (policy + documentation)
### 6) Numbering and naming
Standardize:
- Work order naming format (e.g., WO-YYYY-####)
- Product codes and variants naming
- BOM versioning (if you change BOMs often)
Key workflows
### Workflow 1: Create a BOM
- Create or select a manufactured product item
- Create a BOM for the product
- Add component items and required quantities
- Save and review BOM with production team
- Lock/standardize the BOM once stable
Tips:
- Avoid “misc” component lines; use real items to keep reporting clean.
- Add notes for critical steps (tolerances, required tools, etc.).
### Workflow 2: Create routings and work centers
- Create required work centers
- Create a routing for the product
- Add ordered steps:
- Step name
- Work center
- Estimated time
- Person in charge (if used)
- Save the routing and validate it matches real operations
### Workflow 3: Create a work order (manufacturing order)
- Choose product to manufacture
- Set quantity and required date
- Select BOM + routing
- Confirm component availability (via Inventory)
- Release the work order to production
### Workflow 4: Issue materials (inventory integration)
Common approaches:
- Issue at start (reserve/issue full BOM quantities upfront)
- Issue by step (issue per routing step)
- Issue at completion (less common; weaker controls)
Steps:
- Confirm required components and quantities
- Post issuing movements from the source warehouse
- Track shortages and trigger procurement when required
### Workflow 5: Execute production and record progress
- Start work order
- Progress through routing steps
- Record:
- completed quantities
- time/notes (if used)
- blockers and exceptions
- Mark work order complete when finished
### Workflow 6: Receive finished goods + close the order
- Receive finished goods into target warehouse
- Confirm inventory reflects the new stock on hand
- Close work order
- Review material usage vs planned quantities (variance)
Reports
Common manufacturing views:
- BOM list and BOM component breakdown
- Work orders by status (planned / in progress / complete)
- Work center workload (where supported)
- Production output and completion history
- Material usage vs plan (variance review)
- Export packs for audits/reporting (via Exports)
Recommended cadence:
- Daily: work order queue + shortages
- Weekly: throughput review + bottlenecks
- Monthly: variance + master data cleanup (BOM/routing accuracy)
Troubleshooting / FAQ
### Can’t create a BOM because items are missing
- Ensure component items exist in Inventory.
- Ensure item groups and units are configured.
### Work order can’t start due to shortages
- Check stock on hand for components.
- Trigger procurement or transfer stock from another warehouse.
- If policy allows, partially issue and proceed with remaining later.
### Finished goods stock doesn’t increase
- Confirm receiving was posted to the correct warehouse.
- Confirm the work order was completed/closed in your flow.
### Material usage is inconsistent
- Review BOM accuracy (correct quantities, correct components).
- Review who can edit BOMs and enforce approvals for changes.
- Track adjustments with reasons (rework/scrap/corrections).
---
Need help with this section? Contact our team for guided setup support.